1978 - Designed the TIG weld industry's first true microTIG welder for welding below 1 ampere reliably.
1980 - Designed a line of accessory lathes, specialized tooling for Automatic TIG welding.
1985 - Expanded product line of manufactured products/services to include 300+ampere power supplies.
1990 - Developed a full line of computer controlled power supplies for the industry to enable higher quality welds with lower skill requirements.
1993 - Developed a micro-plasma/plasma welding system for a wide variety of high reliability industries.
1994 - Expanded our line further to include pulsed ND:YAG laser welding systems and welding services.
1997 - Moved to a 25,000 sq. ft. building and added a full serviced CNC machine shop and tool maker to better serve our customers.
2000 - Expanded our welding services group to include 2 ND:YAG laser
welders, 6 automatic plasma cells, 1 ft, 3 ft and 6 ft seam welder and helium leak checking services
2002 - Developed a "1-step" shop for economically priced contract
machining, forming, assembly welding and inspection.